Nov 26, 2007

Petrom to build Romanian fuel terminal

Romanian oil and gas group Petrom is set to build a fuel terminal in Bucharest, Romania, costing €32 million.

The terminal, due to come online before 2009, will have a total capacity of 27,000 cubic metres and five multi-product loading lines for bottom and top-loading, as well as an unloading facility for 20 railway trucks.

The terminal will be provided with a vapour recovery unit, fire protection system and terminal control and tank farm management system.

No comments: